 Home : Construction of Industrial Complexes
Unye Drinking Water Network ORDU
General Directorate of Bank of Provinces  
Project:
97,700m (100mm-500mm) + 11,100m(200mm-450mm) pipelines, 6 deep well motopump building, promotion center of 2 and 5 group, 200m3 - 1000m3 - 1500m3 - 2000m3 reinforced concrete embedded store, equipment of maneuvering room, 9 installation and supply of discharging, 1580m construction of concrete pipelines. (150mm - 200mm - 300mm).


Contract Dates:
04.01.89 to 02.03.94

Cost:
US$4.007.348.-

Completion and stage 2 remaining construction works.
General directorate of Turkish Sugar Factory

Project:
Ilgın Şeker Fabrikası
Construction of a complete sugar factory.

Contract Dates:
13.01.87 to 27.11.87

Cost: US$5.359.499.-

Liquid Fuel Complex construction at Trabzon Airport / Trabzon
General Directorate of Railways, Ports and Airfields Construction.

Project:
Construction of 600+1250tons liquid fuel complex.


Contract Dates:
20.01.95 to 13.08.96

Cost:
US$3.981.
705.-

  MÖN Construction & Trade Co.  Tel:(90)(312) 446 38 90 / Fax:(90)(312) 446 47 91